Renewable Energy | Hydroelectric Power

Archive

Namewaminikan Hydro Inc., an affiliate of AXOR, has developed, financed and constructed two run‑of‑river reactors with a total capacity of 10 MW on the Namewaminikan River, approximately 12 kilometres north of the community of Beardmore in the Greenstone Region in Ontario. The Twin Falls generating station, located further upstream, was commissioned in...

Built in 1911 and acquired by Hydro‑Québec during the nationalization of electricity, the Jean‑Guérin spillway dam was recovered by AXOR in 1997, which then built a hydroelectric installation including a water intake, a penstock, and a power station which houses the Saxo‑Kaplan turbine with a...

In the 1990s, AXOR recovered this financially troubled project, revised its design, and finally developed a 10 MW power plant in two phases, which today houses two Saxo‑Kaplan turbines. Located on the Sainte‑Anne River between Saint‑Alban and Sainte‑Christine‑d’Auvergne, the project uses a drop of 26 metres to...

Management, financing, design, construction, and operation; development of the first large‑scale wind farm in Canada (MICON 1800 wind turbines (76 in Cap‑Chat and 57 in Matane, 133 turbines, 100 MW of installed capacity); pre‑feasibility and feasibility studies, environmental impact study, choice of site layout, layout optimization, preliminary design, assessment of required...

Submit a general application